Project Evaluation Committee

Automated DPR Analysis & PEC Scoring Dashboard

UPSIDA Operating Manual for Industrial Area 2024 — Section 2.04

AI-Powered Extraction

Data auto-extracted from Detailed Project Reports

Plots

6

with applications

Applications

15

total received

Avg Score

62.5

out of 100

Recommended

9

score ≥ 50

P

Priya MehtaRank 2 of 2 for this plot

Mehta Leather Works · Manufacturing · Leather Goods & Accessories

75

/100

AI SynthesisGenerated from PEC score + verification flags
Lean: Approve

Solid women-led exporter with one minor PCB caveat

Priya Mehta brings a 12-year leather export business with DGFT-verified shipping bills (Rs.18.6 Cr to UAE/UK/USA). GSTN turnover matches DPR. One past PCB consent renewal delay (2022, fined Rs.25K) was fully resolved and shouldn't block this allotment.

Key Strengths

  • DGFT-verified Rs.18.6 Cr exports over 3 years — confirms EOU claim
  • Women Entrepreneur priority category (>26% shareholding verified)
  • Long operating history with strong GST compliance

Key Concerns

  • One historical PCB delay (resolved) — worth noting in lease conditions

Synthesis combines auto-extracted DPR data, PEC score of 75/100, and external verifications. Final decision rests with the committee.

🛡️ External Verification & Risk Flags

Cross-checked against official government data sources

4 Verified1 Info1 Warning

Data sources consulted

GSTN

Goods & Services Tax Network

Govt. of India · gst.gov.in

MCA

Ministry of Corporate Affairs

Govt. of India · mca.gov.in

DGFT

Directorate General of Foreign Trade

Govt. of India · dgft.gov.in

EPFO

Employees' Provident Fund Organisation

Govt. of India · epfindia.gov.in

Other IDAs

NOIDA / GIDA / YEIDA / UPSIDC records

State Industrial Development Authorities

UPPCB

UP Pollution Control Board

Govt. of UP · uppcb.com

UPPCBUPPCB Warning

Past consent renewal delay

Existing tannery unit (Agra) had a 4-month delay in Consent-to-Operate renewal in 2022. Resolved with fine of Rs.25,000.

UPPCB Case 2022/AGR/1142

Other IDAsOther IDAs Info

Prior allotment at NOIDA — compliant

Holds an existing 1,200 sqm plot at NOIDA Sector-9 (allotted 2015). Construction completed in time, production started.

NOIDA Allotment 2015/SEC09/0418

GSTNGSTN Verified

GST Returns Match

Declared turnover Rs.32 Cr matches GSTN data. Strong export filings (LUT in place).

GSTIN 09FGHIJ5678K2L0

MCAMCA Verified

Established partnership

Registered 12 years ago. Partners have clean track record.

Partnership Reg 2013/PB/4421

DGFTDGFT Verified

Export history verified

IEC active since 2014. 247 shipping bills filed in last 3 years, Rs.18.6 Cr in exports to UAE, UK, USA. Status registrant exporter.

IEC 0514040123

EPFOEPFO Verified

EPF compliance clean

162 employees enrolled at existing Agra unit. No defaults in last 36 months.

EPFO Code UPAGR0098765000

PEC Score Breakdown

Operating Manual 2024, Section 2.04

1. Proposed Capital Investment

Investment on construction of Building, Plants & Machineries relative to investment on land

10/20
10/20

Extracted from DPR

Investment on Building: Rs. 350.00 Lakhs(DPR Section 4.2 - Capital Expenditure Plan, Page 12)
Investment on Plant & Machinery: Rs. 400.00 Lakhs(DPR Section 4.3 - Machinery & Equipment Schedule, Page 14)
Investment on Land: Rs. 250.00 Lakhs(DPR Section 4.1 - Land Acquisition Cost, Page 11)

Calculation: Building (Rs.350L) + Machinery (Rs.400L) = Rs.750L | Land = Rs.250L | Ratio = 3.00x (Up to 3x) = 10 marks

2. Employment Generation (Direct)

1 mark for every 5 persons of direct employment generated

20/20
20/20

Extracted from DPR

Proposed Direct Employment: 350 persons(DPR Section 5.1 - Human Resource Plan, Page 18)
Skilled / Unskilled Split: 210 skilled, 140 unskilled(DPR Section 5.2 - Workforce Breakdown, Page 19)

Calculation: 350 persons / 5 = 70.0 = 20 marks (max 20)

3. Proposed Timeline to Start Production

Time from date of allotment to commencement of production. Extension fees apply if not met.

15/20
15/20

Extracted from DPR

Production Start Timeline: 18 months from allotment(DPR Section 6.1 - Implementation Schedule, Page 22)
Construction Phase: 11 months(DPR Section 6.2 - Construction Timeline, Page 23)
Commissioning Phase: 8 months(DPR Section 6.3 - Equipment Installation & Testing, Page 24)

Calculation: 18 months falls in band "12 to 18 months" = 15 marks

4. Relevant Experience

1 mark for each year of related experience. Max 10 for 10+ years.

10/10
10/10

Extracted from DPR

Years of Relevant Experience: 15 years(DPR Section 2.1 - Promoter's Background, Page 5)
Industry Domain: Manufacturing(DPR Section 2.2 - Track Record & Past Projects, Page 6)

Calculation: 15 years x 1 mark/year = 10 marks (max 10)

5. Extension of Existing Unit in Same IA

Requirement of additional land for extension of unit in same Industrial Area or for expansion

0/10
0/10

Extracted from DPR

Existing Unit in Same IA: No - New Establishment(DPR Section 1.3 - Project Background & Rationale, Page 3)

Calculation: New establishment — 0 marks

6. 100% Export Oriented Unit

Certificate from Directorate of Industries and Export Promotion Council is mandatory

10/10
10/10

Extracted from DPR

Export Orientation: 100% EOU(DPR Section 7.3 - Marketing & Sales Strategy, Page 28)
DIEC Certificate: Certificate attached(DPR Annexure D - Export Promotion Council Certificate, Annexure)

Calculation: 100% EOU with valid DIEC certificate — 10 marks

7. Female / SC/ST / Physically Challenged Entrepreneur

In case of company/partnership, minimum 26% shareholding required from eligible category

5/5
5/5

Extracted from DPR

Applicant Category: Women Entrepreneur(DPR Section 2.3 - Promoter Profile & Social Category, Page 7)
Category Shareholding: 26% or above (verified from Registration documents)(DPR Section 2.4 - Shareholding Pattern / Constitution, Page 8)

Calculation: Women Entrepreneur with >= 26% shareholding — 5 marks

8. Net Worth or Turnover > Rs. 10 Crore

Net worth or turnover of applicant for previous financial year exceeds Rs. 10 Crore

5/5
5/5

Extracted from DPR

Net Worth (Previous FY): Rs. 2500.00 Lakhs (Rs. 25.00 Crore)(DPR Section 3.1 - Audited Balance Sheet, Page 9)
Net Turnover (Previous FY): Rs. 3200.00 Lakhs (Rs. 32.00 Crore)(DPR Section 3.2 - Audited P&L Statement, Page 10)

Calculation: Net Worth Rs. 25.00 Cr exceeds Rs. 10 Crore — 5 marks

Total Score

75/100
Strongly Recommended
C1
10/20
C2
20/20
C3
15/20
C4
10/10
C5
0/10
C6
10/10
C7
5/5
C8
5/5

Land Requirement Assessment

Investment Based (Method i)

2000 sqm per Rs. 1 Crore of proposed investment

Rs. 1200 Lakhs = Rs. 12.00 Cr x 2000 sqm/Cr

= 24,000 sqm

Coverage Based (Method ii)

333% of proposed covered area

Covered area 1100 sqm (55% of 2000 sqm) x 3.33

= 3,663 sqm

Premium Based (Method iii)

Proposed investment on land / prevailing premium rate of the IA

Rs. 250 Lakhs x 1,00,000 / Rs. 3500/sqm

= 7,143 sqm

Max Recommended:24,000 sqm
Requested:2,000 sqm
Within recommended limits

Project Summary

Firm:Mehta Leather Works
Industry:Manufacturing
Product:Leather Goods & Accessories

Uploaded Documents

📄Detailed Project Report (DPR)
📄PAN / Identity Proof
📄Land Utilisation Plan
📄Proposed Turnover / Financials
📄Cancelled Cheque
📄Applicant Photo

Committee Review & Action

#CriterionAutoCommitteeMax
1Proposed Capital Investment1020
2Employment Generation (Direct)2020
3Proposed Timeline to Start Production1520
4Relevant Experience1010
5Extension of Existing Unit in Same IA010
6100% Export Oriented Unit1010
7Female / SC/ST / Physically Challenged Entrepreneur55
8Net Worth or Turnover > Rs. 10 Crore55
Total7575100