Project Evaluation Committee

Automated DPR Analysis & PEC Scoring Dashboard

UPSIDA Operating Manual for Industrial Area 2024 — Section 2.04

AI-Powered Extraction

Data auto-extracted from Detailed Project Reports

Plots

6

with applications

Applications

15

total received

Avg Score

62.5

out of 100

Recommended

9

score ≥ 50

K

Kavita SinghRank 1 of 2 for this plot

DigiCraft Solutions Pvt Ltd · IT/Software · AI & Data Analytics Platform

78

/100

AI SynthesisGenerated from PEC score + verification flags
Lean: Approve

Clean women-led software exporter — solid choice

Kavita Singh's IT/ITES company shows clean GST, MCA and DGFT records — Rs.8.4 Cr in software exports verified via SOFTEX forms over 2 years. 8-year operating history, Women Entrepreneur category, no PCB concerns (software is exempt). Borderline score but strong external validation.

Key Strengths

  • DGFT-verified software exports (SOFTEX forms)
  • Women Entrepreneur priority category
  • 8-year operating track record with clean MCA

Synthesis combines auto-extracted DPR data, PEC score of 78/100, and external verifications. Final decision rests with the committee.

🛡️ External Verification & Risk Flags

Cross-checked against official government data sources

4 Verified

Data sources consulted

GSTN

Goods & Services Tax Network

Govt. of India · gst.gov.in

MCA

Ministry of Corporate Affairs

Govt. of India · mca.gov.in

DGFT

Directorate General of Foreign Trade

Govt. of India · dgft.gov.in

UPPCB

UP Pollution Control Board

Govt. of UP · uppcb.com

GSTNGSTN Verified

GST Returns Match

Declared Rs.11 Cr matches GSTN. Strong export filings — LUT active.

GSTIN 09RSTUV2345W6X7

MCAMCA Verified

Company in good standing

Active since 2018-05-26 (8 years). No director defaults.

CIN U72200UP2016PTC081230

DGFTDGFT Verified

Software export track record

IEC active since 2017. SOFTEX forms verify Rs.8.4 Cr of software exports in last 2 years (US, EU clients).

IEC 0517031245

UPPCBUPPCB Verified

No PCB violations

Software services — exempt from PCB consent requirements.

PEC Score Breakdown

Operating Manual 2024, Section 2.04

1. Proposed Capital Investment

Investment on construction of Building, Plants & Machineries relative to investment on land

10/20
10/20

Extracted from DPR

Investment on Building: Rs. 100.00 Lakhs(DPR Section 4.2 - Capital Expenditure Plan, Page 12)
Investment on Plant & Machinery: Rs. 80.00 Lakhs(DPR Section 4.3 - Machinery & Equipment Schedule, Page 14)
Investment on Land: Rs. 70.00 Lakhs(DPR Section 4.1 - Land Acquisition Cost, Page 11)

Calculation: Building (Rs.100L) + Machinery (Rs.80L) = Rs.180L | Land = Rs.70L | Ratio = 2.57x (Up to 3x) = 10 marks

2. Employment Generation (Direct)

1 mark for every 5 persons of direct employment generated

20/20
20/20

Extracted from DPR

Proposed Direct Employment: 200 persons(DPR Section 5.1 - Human Resource Plan, Page 18)
Skilled / Unskilled Split: 120 skilled, 80 unskilled(DPR Section 5.2 - Workforce Breakdown, Page 19)

Calculation: 200 persons / 5 = 40.0 = 20 marks (max 20)

3. Proposed Timeline to Start Production

Time from date of allotment to commencement of production. Extension fees apply if not met.

20/20
20/20

Extracted from DPR

Production Start Timeline: 10 months from allotment(DPR Section 6.1 - Implementation Schedule, Page 22)
Construction Phase: 6 months(DPR Section 6.2 - Construction Timeline, Page 23)
Commissioning Phase: 4 months(DPR Section 6.3 - Equipment Installation & Testing, Page 24)

Calculation: 10 months falls in band "In 12 Months" = 20 marks

4. Relevant Experience

1 mark for each year of related experience. Max 10 for 10+ years.

8/10
8/10

Extracted from DPR

Years of Relevant Experience: 8 years(DPR Section 2.1 - Promoter's Background, Page 5)
Industry Domain: IT/Software(DPR Section 2.2 - Track Record & Past Projects, Page 6)

Calculation: 8 years x 1 mark/year = 8 marks (max 10)

5. Extension of Existing Unit in Same IA

Requirement of additional land for extension of unit in same Industrial Area or for expansion

0/10
0/10

Extracted from DPR

Existing Unit in Same IA: No - New Establishment(DPR Section 1.3 - Project Background & Rationale, Page 3)

Calculation: New establishment — 0 marks

6. 100% Export Oriented Unit

Certificate from Directorate of Industries and Export Promotion Council is mandatory

10/10
10/10

Extracted from DPR

Export Orientation: 100% EOU(DPR Section 7.3 - Marketing & Sales Strategy, Page 28)
DIEC Certificate: Certificate attached(DPR Annexure D - Export Promotion Council Certificate, Annexure)

Calculation: 100% EOU with valid DIEC certificate — 10 marks

7. Female / SC/ST / Physically Challenged Entrepreneur

In case of company/partnership, minimum 26% shareholding required from eligible category

5/5
5/5

Extracted from DPR

Applicant Category: Women Entrepreneur(DPR Section 2.3 - Promoter Profile & Social Category, Page 7)
Category Shareholding: 26% or above (verified from Registration documents)(DPR Section 2.4 - Shareholding Pattern / Constitution, Page 8)

Calculation: Women Entrepreneur with >= 26% shareholding — 5 marks

8. Net Worth or Turnover > Rs. 10 Crore

Net worth or turnover of applicant for previous financial year exceeds Rs. 10 Crore

5/5
5/5

Extracted from DPR

Net Worth (Previous FY): Rs. 600.00 Lakhs (Rs. 6.00 Crore)(DPR Section 3.1 - Audited Balance Sheet, Page 9)
Net Turnover (Previous FY): Rs. 1100.00 Lakhs (Rs. 11.00 Crore)(DPR Section 3.2 - Audited P&L Statement, Page 10)

Calculation: Turnover Rs. 11.00 Cr exceeds Rs. 10 Crore — 5 marks

Total Score

78/100
Strongly Recommended
C1
10/20
C2
20/20
C3
20/20
C4
8/10
C5
0/10
C6
10/10
C7
5/5
C8
5/5

Land Requirement Assessment

Investment Based (Method i)

2000 sqm per Rs. 1 Crore of proposed investment

Rs. 300 Lakhs = Rs. 3.00 Cr x 2000 sqm/Cr

= 6,000 sqm

Coverage Based (Method ii)

333% of proposed covered area

Covered area 600 sqm (75% of 800 sqm) x 3.33

= 1,998 sqm

Premium Based (Method iii)

Proposed investment on land / prevailing premium rate of the IA

Rs. 70 Lakhs x 1,00,000 / Rs. 3500/sqm

= 2,000 sqm

Max Recommended:6,000 sqm
Requested:800 sqm
Within recommended limits

Project Summary

Firm:DigiCraft Solutions Pvt Ltd
Industry:IT/Software
Product:AI & Data Analytics Platform

Uploaded Documents

📄Detailed Project Report (DPR)
📄PAN / Identity Proof
📄Land Utilisation Plan
📄Proposed Turnover / Financials
📄Cancelled Cheque
📄Applicant Photo

Committee Review & Action

#CriterionAutoCommitteeMax
1Proposed Capital Investment1020
2Employment Generation (Direct)2020
3Proposed Timeline to Start Production2020
4Relevant Experience810
5Extension of Existing Unit in Same IA010
6100% Export Oriented Unit1010
7Female / SC/ST / Physically Challenged Entrepreneur55
8Net Worth or Turnover > Rs. 10 Crore55
Total7878100