Project Evaluation Committee

Automated DPR Analysis & PEC Scoring Dashboard

UPSIDA Operating Manual for Industrial Area 2024 — Section 2.04

AI-Powered Extraction

Data auto-extracted from Detailed Project Reports

Plots

6

with applications

Applications

15

total received

Avg Score

62.5

out of 100

Recommended

9

score ≥ 50

S

Sunita Devi AgarwalRank 3 of 3 for this plot

Agarwal Textiles · Textile · Cotton Textiles & Garments

60

/100

AI SynthesisGenerated from PEC score + verification flags
Lean: Approve

Modest but clean women-led textile applicant

Sunita Agarwal's proprietorship has clean GST returns (Rs.9 Cr) and verified Udyam registration. As a sole proprietor MCA data is limited but Udyam record confirms 10 years of operations. No PCB concerns — weaving is non-polluting. A reasonable fit for the Kanpur textile cluster.

Key Strengths

  • Women Entrepreneur category
  • Clean GST + Udyam record
  • Non-polluting industry profile

Key Concerns

  • Sole proprietorship limits independent verification of net-worth claim

Synthesis combines auto-extracted DPR data, PEC score of 60/100, and external verifications. Final decision rests with the committee.

🛡️ External Verification & Risk Flags

Cross-checked against official government data sources

2 Verified1 Info

Data sources consulted

GSTN

Goods & Services Tax Network

Govt. of India · gst.gov.in

MCA

Ministry of Corporate Affairs

Govt. of India · mca.gov.in

UPPCB

UP Pollution Control Board

Govt. of UP · uppcb.com

MCAMCA Info

Proprietorship — limited MCA data

No CIN as this is a sole proprietorship. Udyam Registration verified.

Udyam UP-26-0012345

GSTNGSTN Verified

GST Returns Match

Declared turnover Rs.9 Cr matches GSTN. Proprietorship — annual returns filed.

GSTIN 09RSTUV3456W7X8

UPPCBUPPCB Verified

No PCB violations

Clean record. Existing weaving unit operates without effluent.

PEC Score Breakdown

Operating Manual 2024, Section 2.04

1. Proposed Capital Investment

Investment on construction of Building, Plants & Machineries relative to investment on land

10/20
10/20

Extracted from DPR

Investment on Building: Rs. 100.00 Lakhs(DPR Section 4.2 - Capital Expenditure Plan, Page 12)
Investment on Plant & Machinery: Rs. 120.00 Lakhs(DPR Section 4.3 - Machinery & Equipment Schedule, Page 14)
Investment on Land: Rs. 80.00 Lakhs(DPR Section 4.1 - Land Acquisition Cost, Page 11)

Calculation: Building (Rs.100L) + Machinery (Rs.120L) = Rs.220L | Land = Rs.80L | Ratio = 2.75x (Up to 3x) = 10 marks

2. Employment Generation (Direct)

1 mark for every 5 persons of direct employment generated

20/20
20/20

Extracted from DPR

Proposed Direct Employment: 120 persons(DPR Section 5.1 - Human Resource Plan, Page 18)
Skilled / Unskilled Split: 72 skilled, 48 unskilled(DPR Section 5.2 - Workforce Breakdown, Page 19)

Calculation: 120 persons / 5 = 24.0 = 20 marks (max 20)

3. Proposed Timeline to Start Production

Time from date of allotment to commencement of production. Extension fees apply if not met.

15/20
15/20

Extracted from DPR

Production Start Timeline: 18 months from allotment(DPR Section 6.1 - Implementation Schedule, Page 22)
Construction Phase: 11 months(DPR Section 6.2 - Construction Timeline, Page 23)
Commissioning Phase: 8 months(DPR Section 6.3 - Equipment Installation & Testing, Page 24)

Calculation: 18 months falls in band "12 to 18 months" = 15 marks

4. Relevant Experience

1 mark for each year of related experience. Max 10 for 10+ years.

10/10
10/10

Extracted from DPR

Years of Relevant Experience: 10 years(DPR Section 2.1 - Promoter's Background, Page 5)
Industry Domain: Textile(DPR Section 2.2 - Track Record & Past Projects, Page 6)

Calculation: 10 years x 1 mark/year = 10 marks (max 10)

5. Extension of Existing Unit in Same IA

Requirement of additional land for extension of unit in same Industrial Area or for expansion

0/10
0/10

Extracted from DPR

Existing Unit in Same IA: No - New Establishment(DPR Section 1.3 - Project Background & Rationale, Page 3)

Calculation: New establishment — 0 marks

6. 100% Export Oriented Unit

Certificate from Directorate of Industries and Export Promotion Council is mandatory

0/10
0/10

Extracted from DPR

Export Orientation: Domestic / Partial Export(DPR Section 7.3 - Marketing & Sales Strategy, Page 28)

Calculation: Not classified as 100% EOU — 0 marks

7. Female / SC/ST / Physically Challenged Entrepreneur

In case of company/partnership, minimum 26% shareholding required from eligible category

5/5
5/5

Extracted from DPR

Applicant Category: Women Entrepreneur(DPR Section 2.3 - Promoter Profile & Social Category, Page 7)
Category Shareholding: 26% or above (verified from Registration documents)(DPR Section 2.4 - Shareholding Pattern / Constitution, Page 8)

Calculation: Women Entrepreneur with >= 26% shareholding — 5 marks

8. Net Worth or Turnover > Rs. 10 Crore

Net worth or turnover of applicant for previous financial year exceeds Rs. 10 Crore

0/5
0/5

Extracted from DPR

Net Worth (Previous FY): Rs. 600.00 Lakhs (Rs. 6.00 Crore)(DPR Section 3.1 - Audited Balance Sheet, Page 9)
Net Turnover (Previous FY): Rs. 900.00 Lakhs (Rs. 9.00 Crore)(DPR Section 3.2 - Audited P&L Statement, Page 10)

Calculation: Net Worth Rs. 6.00 Cr, Turnover Rs. 9.00 Cr — both below Rs. 10 Crore — 0 marks

Total Score

60/100
Recommended
C1
10/20
C2
20/20
C3
15/20
C4
10/10
C5
0/10
C6
0/10
C7
5/5
C8
0/5

Land Requirement Assessment

Investment Based (Method i)

2000 sqm per Rs. 1 Crore of proposed investment

Rs. 350 Lakhs = Rs. 3.50 Cr x 2000 sqm/Cr

= 7,000 sqm

Coverage Based (Method ii)

333% of proposed covered area

Covered area 440 sqm (55% of 800 sqm) x 3.33

= 1,465 sqm

Premium Based (Method iii)

Proposed investment on land / prevailing premium rate of the IA

Rs. 80 Lakhs x 1,00,000 / Rs. 3500/sqm

= 2,286 sqm

Max Recommended:7,000 sqm
Requested:800 sqm
Within recommended limits

Project Summary

Firm:Agarwal Textiles
Industry:Textile
Product:Cotton Textiles & Garments

Uploaded Documents

📄Detailed Project Report (DPR)
📄PAN / Identity Proof
📄Land Utilisation Plan
📄Proposed Turnover / Financials
📄Cancelled Cheque
📄Applicant Photo

Committee Review & Action

#CriterionAutoCommitteeMax
1Proposed Capital Investment1020
2Employment Generation (Direct)2020
3Proposed Timeline to Start Production1520
4Relevant Experience1010
5Extension of Existing Unit in Same IA010
6100% Export Oriented Unit010
7Female / SC/ST / Physically Challenged Entrepreneur55
8Net Worth or Turnover > Rs. 10 Crore05
Total6060100