Project Evaluation Committee

Automated DPR Analysis & PEC Scoring Dashboard

UPSIDA Operating Manual for Industrial Area 2024 — Section 2.04

AI-Powered Extraction

Data auto-extracted from Detailed Project Reports

Plots

6

with applications

Applications

15

total received

Avg Score

62.5

out of 100

Recommended

9

score ≥ 50

A

Arvind PatelRank 1 of 3 for this plot

Patel Auto Components Pvt Ltd · Engineering · Precision Auto Components

80

/100

AI SynthesisGenerated from PEC score + verification flags
Lean: Approve

Reliable mid-cap engineering applicant

Patel Auto Components has a 14-year operating history, Rs.22 Cr verified GST turnover and clean records across MCA and UPPCB. Score sits in the recommend band. Good fit for the Kanpur engineering cluster.

Key Strengths

  • 14-year operating history
  • Clean external verifications across all sources

Synthesis combines auto-extracted DPR data, PEC score of 80/100, and external verifications. Final decision rests with the committee.

🛡️ External Verification & Risk Flags

Cross-checked against official government data sources

4 Verified

Data sources consulted

GSTN

Goods & Services Tax Network

Govt. of India · gst.gov.in

MCA

Ministry of Corporate Affairs

Govt. of India · mca.gov.in

EPFO

Employees' Provident Fund Organisation

Govt. of India · epfindia.gov.in

UPPCB

UP Pollution Control Board

Govt. of UP · uppcb.com

GSTNGSTN Verified

GST Returns Match

Declared Rs.22 Cr matches GSTN data.

GSTIN 09DEFGH4567I8J9

MCAMCA Verified

Company in good standing

Active since 2012-05-26 (14 years). All directors have clean DIN.

CIN U34103UP2010PTC042890

EPFOEPFO Verified

EPF compliance clean

110 employees enrolled at existing plant. All ECR challans paid on time for last 36 months.

EPFO Code UPGZB0089012000

UPPCBUPPCB Verified

No PCB violations

Existing plant has valid CTE/CTO. Clean record.

PEC Score Breakdown

Operating Manual 2024, Section 2.04

1. Proposed Capital Investment

Investment on construction of Building, Plants & Machineries relative to investment on land

15/20
15/20

Extracted from DPR

Investment on Building: Rs. 150.00 Lakhs(DPR Section 4.2 - Capital Expenditure Plan, Page 12)
Investment on Plant & Machinery: Rs. 230.00 Lakhs(DPR Section 4.3 - Machinery & Equipment Schedule, Page 14)
Investment on Land: Rs. 100.00 Lakhs(DPR Section 4.1 - Land Acquisition Cost, Page 11)

Calculation: Building (Rs.150L) + Machinery (Rs.230L) = Rs.380L | Land = Rs.100L | Ratio = 3.80x (Up to 5x) = 15 marks

2. Employment Generation (Direct)

1 mark for every 5 persons of direct employment generated

20/20
20/20

Extracted from DPR

Proposed Direct Employment: 180 persons(DPR Section 5.1 - Human Resource Plan, Page 18)
Skilled / Unskilled Split: 108 skilled, 72 unskilled(DPR Section 5.2 - Workforce Breakdown, Page 19)

Calculation: 180 persons / 5 = 36.0 = 20 marks (max 20)

3. Proposed Timeline to Start Production

Time from date of allotment to commencement of production. Extension fees apply if not met.

20/20
20/20

Extracted from DPR

Production Start Timeline: 12 months from allotment(DPR Section 6.1 - Implementation Schedule, Page 22)
Construction Phase: 8 months(DPR Section 6.2 - Construction Timeline, Page 23)
Commissioning Phase: 5 months(DPR Section 6.3 - Equipment Installation & Testing, Page 24)

Calculation: 12 months falls in band "In 12 Months" = 20 marks

4. Relevant Experience

1 mark for each year of related experience. Max 10 for 10+ years.

10/10
10/10

Extracted from DPR

Years of Relevant Experience: 14 years(DPR Section 2.1 - Promoter's Background, Page 5)
Industry Domain: Engineering(DPR Section 2.2 - Track Record & Past Projects, Page 6)

Calculation: 14 years x 1 mark/year = 10 marks (max 10)

5. Extension of Existing Unit in Same IA

Requirement of additional land for extension of unit in same Industrial Area or for expansion

0/10
0/10

Extracted from DPR

Existing Unit in Same IA: No - New Establishment(DPR Section 1.3 - Project Background & Rationale, Page 3)

Calculation: New establishment — 0 marks

6. 100% Export Oriented Unit

Certificate from Directorate of Industries and Export Promotion Council is mandatory

10/10
10/10

Extracted from DPR

Export Orientation: 100% EOU(DPR Section 7.3 - Marketing & Sales Strategy, Page 28)
DIEC Certificate: Certificate attached(DPR Annexure D - Export Promotion Council Certificate, Annexure)

Calculation: 100% EOU with valid DIEC certificate — 10 marks

7. Female / SC/ST / Physically Challenged Entrepreneur

In case of company/partnership, minimum 26% shareholding required from eligible category

0/5
0/5

Extracted from DPR

Applicant Category: General(DPR Section 2.3 - Promoter Profile & Social Category, Page 7)

Calculation: General category — 0 marks

8. Net Worth or Turnover > Rs. 10 Crore

Net worth or turnover of applicant for previous financial year exceeds Rs. 10 Crore

5/5
5/5

Extracted from DPR

Net Worth (Previous FY): Rs. 1500.00 Lakhs (Rs. 15.00 Crore)(DPR Section 3.1 - Audited Balance Sheet, Page 9)
Net Turnover (Previous FY): Rs. 2200.00 Lakhs (Rs. 22.00 Crore)(DPR Section 3.2 - Audited P&L Statement, Page 10)

Calculation: Net Worth Rs. 15.00 Cr exceeds Rs. 10 Crore — 5 marks

Total Score

80/100
Strongly Recommended
C1
15/20
C2
20/20
C3
20/20
C4
10/10
C5
0/10
C6
10/10
C7
0/5
C8
5/5

Land Requirement Assessment

Investment Based (Method i)

2000 sqm per Rs. 1 Crore of proposed investment

Rs. 550 Lakhs = Rs. 5.50 Cr x 2000 sqm/Cr

= 11,000 sqm

Coverage Based (Method ii)

333% of proposed covered area

Covered area 650 sqm (65% of 1000 sqm) x 3.33

= 2,165 sqm

Premium Based (Method iii)

Proposed investment on land / prevailing premium rate of the IA

Rs. 100 Lakhs x 1,00,000 / Rs. 3500/sqm

= 2,857 sqm

Max Recommended:11,000 sqm
Requested:1,000 sqm
Within recommended limits

Project Summary

Firm:Patel Auto Components Pvt Ltd
Industry:Engineering
Product:Precision Auto Components

Uploaded Documents

📄Detailed Project Report (DPR)
📄PAN / Identity Proof
📄Land Utilisation Plan
📄Proposed Turnover / Financials
📄Cancelled Cheque
📄Applicant Photo

Committee Review & Action

#CriterionAutoCommitteeMax
1Proposed Capital Investment1520
2Employment Generation (Direct)2020
3Proposed Timeline to Start Production2020
4Relevant Experience1010
5Extension of Existing Unit in Same IA010
6100% Export Oriented Unit1010
7Female / SC/ST / Physically Challenged Entrepreneur05
8Net Worth or Turnover > Rs. 10 Crore55
Total8080100