Project Evaluation Committee
Automated DPR Analysis & PEC Scoring Dashboard
UPSIDA Operating Manual for Industrial Area 2024 — Section 2.04
Data auto-extracted from Detailed Project Reports
Plots
6
with applications
Applications
15
total received
Avg Score
62.5
out of 100
Recommended
9
score ≥ 50
Mohammad Irfan KhanRank 3 of 3 for this plot
Khan Silk House · Textile · Silk Sarees & Fabrics
49
/100
Critical GST mismatch — reject
Mohammad Khan's DPR claims Rs.3 Cr turnover but GSTN shows only Rs.0.72 Cr — a 76% overstatement that materially affects PEC Criterion 8 (Net Worth / Turnover) scoring. Compounded by a partnership only 1 year old with limited operating history. This profile fits a typical false-claim pattern; recommendation is to reject and refund EMD.
Key Strengths
- ✓Clean PCB record (silk is non-polluting)
Key Concerns
- ⚠76% turnover overstatement vs GSTN — critical credibility issue
- ⚠Partnership only 1 year old — insufficient track record
- ⚠Low PEC score reflects accurate data, not extraction error
Synthesis combines auto-extracted DPR data, PEC score of 49/100, and external verifications. Final decision rests with the committee.
🛡️ External Verification & Risk Flags
Cross-checked against official government data sources
Data sources consulted
Goods & Services Tax Network
Govt. of India · gst.gov.in
Ministry of Corporate Affairs
Govt. of India · mca.gov.in
e-Courts & National Judicial Data Grid
Govt. of India · ecourts.gov.in
NOIDA / GIDA / YEIDA / UPSIDC records
State Industrial Development Authorities
UP Pollution Control Board
Govt. of UP · uppcb.com
Turnover mismatch — significant
Claimed turnover Rs.3 Cr in DPR, but GSTN shows only Rs.0.72 Cr for FY 2023-24 — a 76% shortfall.
GSTIN 09YZABC4567D8E9
Prior application rejected at GIDA
Same managing partner had applied for a 800 sqm plot at GIDA in 2023 — rejected at PEC stage due to inadequate financials. Not disclosed in current DPR.
GIDA App 2023/GZB/4419
Partnership recently constituted
Partnership registered 2025-05-26 (only 1 year old). Limited operating history.
Partnership Reg 2024/VNS/3312
Active civil suit by supplier
One pending civil suit (Rs.42 L) filed by a raw-silk supplier for non-payment of invoices. Next hearing: Mar 2026.
Varanasi District Court CS 1148/2024
No PCB violations
Clean record. Silk weaving is non-polluting.
PEC Score Breakdown
Operating Manual 2024, Section 2.041. Proposed Capital Investment
Investment on construction of Building, Plants & Machineries relative to investment on land
Extracted from DPR
Calculation: Building (Rs.110L) + Machinery (Rs.150L) = Rs.260L | Land = Rs.90L | Ratio = 2.89x (Up to 3x) = 10 marks
2. Employment Generation (Direct)
1 mark for every 5 persons of direct employment generated
Extracted from DPR
Calculation: 80 persons / 5 = 16.0 = 16 marks (max 20)
3. Proposed Timeline to Start Production
Time from date of allotment to commencement of production. Extension fees apply if not met.
Extracted from DPR
Calculation: 12 months falls in band "In 12 Months" = 20 marks
4. Relevant Experience
1 mark for each year of related experience. Max 10 for 10+ years.
Extracted from DPR
Calculation: 3 years x 1 mark/year = 3 marks (max 10)
5. Extension of Existing Unit in Same IA
Requirement of additional land for extension of unit in same Industrial Area or for expansion
Extracted from DPR
Calculation: New establishment — 0 marks
6. 100% Export Oriented Unit
Certificate from Directorate of Industries and Export Promotion Council is mandatory
Extracted from DPR
Calculation: Not classified as 100% EOU — 0 marks
7. Female / SC/ST / Physically Challenged Entrepreneur
In case of company/partnership, minimum 26% shareholding required from eligible category
Extracted from DPR
Calculation: General category — 0 marks
8. Net Worth or Turnover > Rs. 10 Crore
Net worth or turnover of applicant for previous financial year exceeds Rs. 10 Crore
Extracted from DPR
Calculation: Net Worth Rs. 2.00 Cr, Turnover Rs. 3.00 Cr — both below Rs. 10 Crore — 0 marks
Total Score
Land Requirement Assessment
Investment Based (Method i)
2000 sqm per Rs. 1 Crore of proposed investment
Rs. 400 Lakhs = Rs. 4.00 Cr x 2000 sqm/Cr
= 8,000 sqm
Coverage Based (Method ii)
333% of proposed covered area
Covered area 600 sqm (50% of 1200 sqm) x 3.33
= 1,998 sqm
Premium Based (Method iii)
Proposed investment on land / prevailing premium rate of the IA
Rs. 90 Lakhs x 1,00,000 / Rs. 3500/sqm
= 2,571 sqm
Project Summary
Uploaded Documents
Committee Review & Action
| # | Criterion | Auto | Committee | Max |
|---|---|---|---|---|
| 1 | Proposed Capital Investment | 10 | 20 | |
| 2 | Employment Generation (Direct) | 16 | 20 | |
| 3 | Proposed Timeline to Start Production | 20 | 20 | |
| 4 | Relevant Experience | 3 | 10 | |
| 5 | Extension of Existing Unit in Same IA | 0 | 10 | |
| 6 | 100% Export Oriented Unit | 0 | 10 | |
| 7 | Female / SC/ST / Physically Challenged Entrepreneur | 0 | 5 | |
| 8 | Net Worth or Turnover > Rs. 10 Crore | 0 | 5 | |
| Total | 49 | 49 | 100 | |
Score is below 60/100 minimum threshold — application will not qualify for allotment.