Project Evaluation Committee
Automated DPR Analysis & PEC Scoring Dashboard
UPSIDA Operating Manual for Industrial Area 2024 — Section 2.04
Data auto-extracted from Detailed Project Reports
Plots
6
with applications
Applications
15
total received
Avg Score
62.5
out of 100
Recommended
9
score ≥ 50
Harish Chandra MishraRank 1 of 3 for this plot
Mishra Chemicals Ltd · Chemical · Industrial Chemicals & Dyes
60
/100
Strong financials, but active PCB enforcement is a hard stop
Mishra Chemicals' GSTN, MCA and DGFT records are all strong (Rs.120 Cr turnover, 18-year listed company, Rs.78 Cr exports). However, the existing Unnao plant is under an active UPPCB closure notice since Aug 2024 with NGT case pending — fine of Rs.45 L imposed. New allotment to a promoter currently under environmental enforcement creates regulatory risk. Allotment should be deferred until PCB closure notice is lifted and NGT proceedings conclude.
Key Strengths
- ✓Strong financials and 18-year listed public limited
- ✓Verified Rs.78 Cr DGFT export history (Star Export House 2-star)
- ✓No GST or MCA concerns
Key Concerns
- ⚠Active UPPCB closure notice on existing plant — Rs.45 L fine
- ⚠Pending NGT case (OA 412/2024) on Ganga tributary discharge
Synthesis combines auto-extracted DPR data, PEC score of 60/100, and external verifications. Final decision rests with the committee.
🛡️ External Verification & Risk Flags
Cross-checked against official government data sources
Data sources consulted
Goods & Services Tax Network
Govt. of India · gst.gov.in
Ministry of Corporate Affairs
Govt. of India · mca.gov.in
Directorate General of Foreign Trade
Govt. of India · dgft.gov.in
e-Courts & National Judicial Data Grid
Govt. of India · ecourts.gov.in
NOIDA / GIDA / YEIDA / UPSIDC records
State Industrial Development Authorities
RBI Defaulter Lists & CRILC
Reserve Bank of India · rbi.org.in
UP Pollution Control Board
Govt. of UP · uppcb.com
Pending NGT proceedings
Original applicant in 2 active National Green Tribunal cases over Ganga effluent discharge. Cumulative compensation demand Rs.2.4 Cr.
NGT OA 412/2024 + NGT OA 198/2025
Active PCB violation
Existing chemicals plant (Unnao) under closure notice since Aug 2024 for effluent discharge into Ganga tributary. Fine of Rs.45 L imposed. NGT case pending.
UPPCB Case 2024/UNN/2210 + NGT OA 412/2024
Prior allotment cancelled at GIDA
Sister concern 'Mishra Industrial Chemicals' (same promoters) had a 6,200 sqm plot at GIDA cancelled in 2019 for non-commencement of construction within stipulated time.
GIDA Cancellation 2019/GZB/8821
Working-capital account SMA-0
One operating bank account currently in Special Mention Account category SMA-0 (overdue 1-30 days). Not yet stressed.
GST Returns Match
Declared Rs.120 Cr turnover matches GSTN.
GSTIN 09IJKLM4567N8O9
Public limited, 18 years active
Incorporated 2008-05-26. Listed on NSE Emerge. No director defaults.
CIN L24299UP2006PLC033012
Export history verified
IEC active since 2007. Rs.78 Cr exported in last 3 years across 22 countries. Star Export House (2-star).
IEC 0507098765
PEC Score Breakdown
Operating Manual 2024, Section 2.041. Proposed Capital Investment
Investment on construction of Building, Plants & Machineries relative to investment on land
Extracted from DPR
Calculation: Building (Rs.700L) + Machinery (Rs.1200L) = Rs.1900L | Land = Rs.600L | Ratio = 3.17x (Up to 5x) = 15 marks
2. Employment Generation (Direct)
1 mark for every 5 persons of direct employment generated
Extracted from DPR
Calculation: 600 persons / 5 = 120.0 = 20 marks (max 20)
3. Proposed Timeline to Start Production
Time from date of allotment to commencement of production. Extension fees apply if not met.
Extracted from DPR
Calculation: 30 months falls in band "> 24 months" = 0 marks
4. Relevant Experience
1 mark for each year of related experience. Max 10 for 10+ years.
Extracted from DPR
Calculation: 25 years x 1 mark/year = 10 marks (max 10)
5. Extension of Existing Unit in Same IA
Requirement of additional land for extension of unit in same Industrial Area or for expansion
Extracted from DPR
Calculation: New establishment — 0 marks
6. 100% Export Oriented Unit
Certificate from Directorate of Industries and Export Promotion Council is mandatory
Extracted from DPR
Calculation: 100% EOU with valid DIEC certificate — 10 marks
7. Female / SC/ST / Physically Challenged Entrepreneur
In case of company/partnership, minimum 26% shareholding required from eligible category
Extracted from DPR
Calculation: General category — 0 marks
8. Net Worth or Turnover > Rs. 10 Crore
Net worth or turnover of applicant for previous financial year exceeds Rs. 10 Crore
Extracted from DPR
Calculation: Net Worth Rs. 80.00 Cr exceeds Rs. 10 Crore — 5 marks
Total Score
Land Requirement Assessment
Investment Based (Method i)
2000 sqm per Rs. 1 Crore of proposed investment
Rs. 3000 Lakhs = Rs. 30.00 Cr x 2000 sqm/Cr
= 60,000 sqm
Coverage Based (Method ii)
333% of proposed covered area
Covered area 2000 sqm (50% of 4000 sqm) x 3.33
= 6,660 sqm
Premium Based (Method iii)
Proposed investment on land / prevailing premium rate of the IA
Rs. 600 Lakhs x 1,00,000 / Rs. 3500/sqm
= 17,143 sqm
Project Summary
Uploaded Documents
Committee Review & Action
| # | Criterion | Auto | Committee | Max |
|---|---|---|---|---|
| 1 | Proposed Capital Investment | 15 | 20 | |
| 2 | Employment Generation (Direct) | 20 | 20 | |
| 3 | Proposed Timeline to Start Production | 0 | 20 | |
| 4 | Relevant Experience | 10 | 10 | |
| 5 | Extension of Existing Unit in Same IA | 0 | 10 | |
| 6 | 100% Export Oriented Unit | 10 | 10 | |
| 7 | Female / SC/ST / Physically Challenged Entrepreneur | 0 | 5 | |
| 8 | Net Worth or Turnover > Rs. 10 Crore | 5 | 5 | |
| Total | 60 | 60 | 100 | |