Project Evaluation Committee
Automated DPR Analysis & PEC Scoring Dashboard
UPSIDA Operating Manual for Industrial Area 2024 — Section 2.04
Data auto-extracted from Detailed Project Reports
Plots
6
with applications
Applications
15
total received
Avg Score
62.5
out of 100
Recommended
9
score ≥ 50
Deepak GuptaRank 1 of 1 for this plot
Gupta Sports Industries · Manufacturing · Sports Equipment
40
/100
Low score with irregular GST filings — reject
Deepak Gupta's score falls well below the 60 threshold. 3 of last 12 GST returns filed late, including most recent one belated. Sole proprietorship with minimal investment claim and low employment generation. Doesn't meet the bar for this allotment cycle.
Key Strengths
- ✓No PCB issues
Key Concerns
- ⚠Score 32/100 — well below 60 minimum
- ⚠Irregular GST filing pattern (3 belated returns in 12 months)
Synthesis combines auto-extracted DPR data, PEC score of 40/100, and external verifications. Final decision rests with the committee.
🛡️ External Verification & Risk Flags
Cross-checked against official government data sources
Data sources consulted
Goods & Services Tax Network
Govt. of India · gst.gov.in
Ministry of Corporate Affairs
Govt. of India · mca.gov.in
MSME Samadhaan · Delayed Payment Portal
Ministry of MSME · samadhaan.msme.gov.in
Employees' Provident Fund Organisation
Govt. of India · epfindia.gov.in
UP Pollution Control Board
Govt. of UP · uppcb.com
MSME Samadhaan complaints pending
4 unpaid-invoice complaints filed against the proprietor by MSME suppliers (total Rs.18.4 L). Latest filed Nov 2025 — proceedings ongoing.
Samadhaan Case IDs MSME/UP/2025/1188-1191
GST returns irregular
3 of last 12 monthly GSTR-3B returns filed late. Latest return marked as 'Filed-Belated'.
GSTIN 09FGHIJ1234K5L6
PF contribution defaults
EPF ECR for 2 of last 6 months filed but unpaid. Outstanding dues Rs.1.7 L flagged in EPFO recovery list.
EPFO Code UPMTN0078123000
Proprietorship — limited MCA data
Sole proprietorship. No CIN. Udyam registration active.
Udyam UP-25-0067890
No PCB violations
Sports equipment manufacturing is non-polluting.
PEC Score Breakdown
Operating Manual 2024, Section 2.041. Proposed Capital Investment
Investment on construction of Building, Plants & Machineries relative to investment on land
Extracted from DPR
Calculation: Building (Rs.50L) + Machinery (Rs.60L) = Rs.110L | Land = Rs.40L | Ratio = 2.75x (Up to 3x) = 10 marks
2. Employment Generation (Direct)
1 mark for every 5 persons of direct employment generated
Extracted from DPR
Calculation: 40 persons / 5 = 8.0 = 8 marks (max 20)
3. Proposed Timeline to Start Production
Time from date of allotment to commencement of production. Extension fees apply if not met.
Extracted from DPR
Calculation: 12 months falls in band "In 12 Months" = 20 marks
4. Relevant Experience
1 mark for each year of related experience. Max 10 for 10+ years.
Extracted from DPR
Calculation: 2 years x 1 mark/year = 2 marks (max 10)
5. Extension of Existing Unit in Same IA
Requirement of additional land for extension of unit in same Industrial Area or for expansion
Extracted from DPR
Calculation: New establishment — 0 marks
6. 100% Export Oriented Unit
Certificate from Directorate of Industries and Export Promotion Council is mandatory
Extracted from DPR
Calculation: Not classified as 100% EOU — 0 marks
7. Female / SC/ST / Physically Challenged Entrepreneur
In case of company/partnership, minimum 26% shareholding required from eligible category
Extracted from DPR
Calculation: General category — 0 marks
8. Net Worth or Turnover > Rs. 10 Crore
Net worth or turnover of applicant for previous financial year exceeds Rs. 10 Crore
Extracted from DPR
Calculation: Net Worth Rs. 1.00 Cr, Turnover Rs. 1.50 Cr — both below Rs. 10 Crore — 0 marks
Total Score
Land Requirement Assessment
Investment Based (Method i)
2000 sqm per Rs. 1 Crore of proposed investment
Rs. 180 Lakhs = Rs. 1.80 Cr x 2000 sqm/Cr
= 3,600 sqm
Coverage Based (Method ii)
333% of proposed covered area
Covered area 225 sqm (45% of 500 sqm) x 3.33
= 749 sqm
Premium Based (Method iii)
Proposed investment on land / prevailing premium rate of the IA
Rs. 40 Lakhs x 1,00,000 / Rs. 3500/sqm
= 1,143 sqm
Project Summary
Uploaded Documents
Committee Review & Action
| # | Criterion | Auto | Committee | Max |
|---|---|---|---|---|
| 1 | Proposed Capital Investment | 10 | 20 | |
| 2 | Employment Generation (Direct) | 8 | 20 | |
| 3 | Proposed Timeline to Start Production | 20 | 20 | |
| 4 | Relevant Experience | 2 | 10 | |
| 5 | Extension of Existing Unit in Same IA | 0 | 10 | |
| 6 | 100% Export Oriented Unit | 0 | 10 | |
| 7 | Female / SC/ST / Physically Challenged Entrepreneur | 0 | 5 | |
| 8 | Net Worth or Turnover > Rs. 10 Crore | 0 | 5 | |
| Total | 40 | 40 | 100 | |
Score is below 60/100 minimum threshold — application will not qualify for allotment.