Project Evaluation Committee

Automated DPR Analysis & PEC Scoring Dashboard

UPSIDA Operating Manual for Industrial Area 2024 — Section 2.04

AI-Powered Extraction

Data auto-extracted from Detailed Project Reports

Plots

6

with applications

Applications

15

total received

Avg Score

62.5

out of 100

Recommended

9

score ≥ 50

D

Deepak GuptaRank 1 of 1 for this plot

Gupta Sports Industries · Manufacturing · Sports Equipment

40

/100

AI SynthesisGenerated from PEC score + verification flags
Lean: Reject

Low score with irregular GST filings — reject

Deepak Gupta's score falls well below the 60 threshold. 3 of last 12 GST returns filed late, including most recent one belated. Sole proprietorship with minimal investment claim and low employment generation. Doesn't meet the bar for this allotment cycle.

Key Strengths

  • No PCB issues

Key Concerns

  • Score 32/100 — well below 60 minimum
  • Irregular GST filing pattern (3 belated returns in 12 months)

Synthesis combines auto-extracted DPR data, PEC score of 40/100, and external verifications. Final decision rests with the committee.

🛡️ External Verification & Risk Flags

Cross-checked against official government data sources

1 Verified1 Info2 Warning1 Critical

Data sources consulted

GSTN

Goods & Services Tax Network

Govt. of India · gst.gov.in

MCA

Ministry of Corporate Affairs

Govt. of India · mca.gov.in

Samadhaan

MSME Samadhaan · Delayed Payment Portal

Ministry of MSME · samadhaan.msme.gov.in

EPFO

Employees' Provident Fund Organisation

Govt. of India · epfindia.gov.in

UPPCB

UP Pollution Control Board

Govt. of UP · uppcb.com

SamadhaanSamadhaan Critical

MSME Samadhaan complaints pending

4 unpaid-invoice complaints filed against the proprietor by MSME suppliers (total Rs.18.4 L). Latest filed Nov 2025 — proceedings ongoing.

Samadhaan Case IDs MSME/UP/2025/1188-1191

GSTNGSTN Warning

GST returns irregular

3 of last 12 monthly GSTR-3B returns filed late. Latest return marked as 'Filed-Belated'.

GSTIN 09FGHIJ1234K5L6

EPFOEPFO Warning

PF contribution defaults

EPF ECR for 2 of last 6 months filed but unpaid. Outstanding dues Rs.1.7 L flagged in EPFO recovery list.

EPFO Code UPMTN0078123000

MCAMCA Info

Proprietorship — limited MCA data

Sole proprietorship. No CIN. Udyam registration active.

Udyam UP-25-0067890

UPPCBUPPCB Verified

No PCB violations

Sports equipment manufacturing is non-polluting.

PEC Score Breakdown

Operating Manual 2024, Section 2.04

1. Proposed Capital Investment

Investment on construction of Building, Plants & Machineries relative to investment on land

10/20
10/20

Extracted from DPR

Investment on Building: Rs. 50.00 Lakhs(DPR Section 4.2 - Capital Expenditure Plan, Page 12)
Investment on Plant & Machinery: Rs. 60.00 Lakhs(DPR Section 4.3 - Machinery & Equipment Schedule, Page 14)
Investment on Land: Rs. 40.00 Lakhs(DPR Section 4.1 - Land Acquisition Cost, Page 11)

Calculation: Building (Rs.50L) + Machinery (Rs.60L) = Rs.110L | Land = Rs.40L | Ratio = 2.75x (Up to 3x) = 10 marks

2. Employment Generation (Direct)

1 mark for every 5 persons of direct employment generated

8/20
8/20

Extracted from DPR

Proposed Direct Employment: 40 persons(DPR Section 5.1 - Human Resource Plan, Page 18)
Skilled / Unskilled Split: 24 skilled, 16 unskilled(DPR Section 5.2 - Workforce Breakdown, Page 19)

Calculation: 40 persons / 5 = 8.0 = 8 marks (max 20)

3. Proposed Timeline to Start Production

Time from date of allotment to commencement of production. Extension fees apply if not met.

20/20
20/20

Extracted from DPR

Production Start Timeline: 12 months from allotment(DPR Section 6.1 - Implementation Schedule, Page 22)
Construction Phase: 8 months(DPR Section 6.2 - Construction Timeline, Page 23)
Commissioning Phase: 5 months(DPR Section 6.3 - Equipment Installation & Testing, Page 24)

Calculation: 12 months falls in band "In 12 Months" = 20 marks

4. Relevant Experience

1 mark for each year of related experience. Max 10 for 10+ years.

2/10
2/10

Extracted from DPR

Years of Relevant Experience: 2 years(DPR Section 2.1 - Promoter's Background, Page 5)
Industry Domain: Manufacturing(DPR Section 2.2 - Track Record & Past Projects, Page 6)

Calculation: 2 years x 1 mark/year = 2 marks (max 10)

5. Extension of Existing Unit in Same IA

Requirement of additional land for extension of unit in same Industrial Area or for expansion

0/10
0/10

Extracted from DPR

Existing Unit in Same IA: No - New Establishment(DPR Section 1.3 - Project Background & Rationale, Page 3)

Calculation: New establishment — 0 marks

6. 100% Export Oriented Unit

Certificate from Directorate of Industries and Export Promotion Council is mandatory

0/10
0/10

Extracted from DPR

Export Orientation: Domestic / Partial Export(DPR Section 7.3 - Marketing & Sales Strategy, Page 28)

Calculation: Not classified as 100% EOU — 0 marks

7. Female / SC/ST / Physically Challenged Entrepreneur

In case of company/partnership, minimum 26% shareholding required from eligible category

0/5
0/5

Extracted from DPR

Applicant Category: General(DPR Section 2.3 - Promoter Profile & Social Category, Page 7)

Calculation: General category — 0 marks

8. Net Worth or Turnover > Rs. 10 Crore

Net worth or turnover of applicant for previous financial year exceeds Rs. 10 Crore

0/5
0/5

Extracted from DPR

Net Worth (Previous FY): Rs. 100.00 Lakhs (Rs. 1.00 Crore)(DPR Section 3.1 - Audited Balance Sheet, Page 9)
Net Turnover (Previous FY): Rs. 150.00 Lakhs (Rs. 1.50 Crore)(DPR Section 3.2 - Audited P&L Statement, Page 10)

Calculation: Net Worth Rs. 1.00 Cr, Turnover Rs. 1.50 Cr — both below Rs. 10 Crore — 0 marks

Total Score

40/100
Not Recommended
C1
10/20
C2
8/20
C3
20/20
C4
2/10
C5
0/10
C6
0/10
C7
0/5
C8
0/5

Land Requirement Assessment

Investment Based (Method i)

2000 sqm per Rs. 1 Crore of proposed investment

Rs. 180 Lakhs = Rs. 1.80 Cr x 2000 sqm/Cr

= 3,600 sqm

Coverage Based (Method ii)

333% of proposed covered area

Covered area 225 sqm (45% of 500 sqm) x 3.33

= 749 sqm

Premium Based (Method iii)

Proposed investment on land / prevailing premium rate of the IA

Rs. 40 Lakhs x 1,00,000 / Rs. 3500/sqm

= 1,143 sqm

Max Recommended:3,600 sqm
Requested:500 sqm
Within recommended limits

Project Summary

Firm:Gupta Sports Industries
Industry:Manufacturing
Product:Sports Equipment

Uploaded Documents

📄Detailed Project Report (DPR)
📄PAN / Identity Proof
📄Land Utilisation Plan
📄Proposed Turnover / Financials
📄Cancelled Cheque
📄Applicant Photo

Committee Review & Action

#CriterionAutoCommitteeMax
1Proposed Capital Investment1020
2Employment Generation (Direct)820
3Proposed Timeline to Start Production2020
4Relevant Experience210
5Extension of Existing Unit in Same IA010
6100% Export Oriented Unit010
7Female / SC/ST / Physically Challenged Entrepreneur05
8Net Worth or Turnover > Rs. 10 Crore05
Total4040100

Score is below 60/100 minimum threshold — application will not qualify for allotment.